Tender Announcement
EBS Petroleum
Company Limited, a company existing under the laws of Hong Kong, with its
headquarters in Hong Kong and the branch office registered in EBS COMPANY Camp,
Nahrawan, Baghdad, Iraq, acting as Operator of EBS Oilfield, is pleased to make
the following public tender announcement:
Tender Title |
Provision
of Casing |
Tender Number |
025-PC-24-EBS
(2nd Announcement) |
Tender Announcement Website |
1) All the Bidders should register in our system
following the instruction of below website (online bidding system): https://erp.ebspetroleum.com/osr/a
2) After Company Confirmation, only the bidders
who have been registered successfully can download our ITB documents and all
clarifications. |
Online Bidding System Manual |
Bidder shall
follow SECTION 6_ITB_Online Bidding System Manual |
Bid Closing Date |
No later than
16:00 (Baghdad Time), on or before
May 12th, 2025. In the event that closing date coincides
with an official holiday or curfew, the closing date shall be automatically
extended to the following working day. |
Bid Delivery |
For submission
online, the bid proposals shall be submitted as per the procedure specified
in Online Bidding System Manual.
For submission
of the hard copy of bid proposal packages, they must be submitted to the following
address: Attention: Mr.
Zhang Xianqiao and Mr. Yang Guang Address: EBS
Petroleum S2 Camp, Nahrawan, Baghdad, Iraq. Tel: +964 (0)
773 493 7887 and (0) 773 493 7889 |
Tender Contact
Emails |
All clarification and correspondences from Bidders shall be via online bidding system. |
Entry Pass |
Bidder
must provide entry pass application form (refer to attachment C in Section 1)
at least 2 working days prior to Bid Closing Date. |
Bid Validity Period |
Subject
to Article 12.0 in Section 1, Bidder’s bid Proposal shall be irrevocable for
a period Three Hundred and Sixty-Five (365) calendar days (“Bid Validity
Period”). |
Main Factors |
All bidders
should focus on the below main factors, including but not limited to: (1) Submission
of BID ACKNOWLEDGEMENT (refer to attachment A in Section 1) (2) Bid bond
submission (3) Commercial
proposal is separate from the technical proposal. (4) A bidder is
considered eligible to participate in tenders if it is not under suspension
or blacklisted in Iraq or Internationally banned. (5) A bidder and
its affiliate are considered unqualified to participate in the tender if it
is part of an ongoing litigation/arbitration with the Company or the outcome
of a litigation/arbitration proved the bidder is in breach, unless otherwise
agreed with related Government authority required by Company. (6) Bidders are
not allowed to provide goods, works or services under a contract where they
provide consulting services unless otherwise agreed with related Government
authority required by Company. the only exceptions would be Turnkey Contracts
where design, supply and construction activities are an integral part of the
Contract. (7) A bidder may
submit only one bid or participate as a joint venture partner or Consortium
member (if allowed for this tender) in only one bid for each tender. Failure
to comply will result in the disqualification of that bidders. |
Bid Bond |
Bid Bond: USD 250,000.00
(Two Hundred and Fifty Thousand US Dollars Only), The Bid Bond must be
delivered by hand to Company in sealed envelope and duly marked and
stamped on outer envelope. Subject
to Article 12.0 in Section 1, the original validity of the Bid Bond shall be the same as aforementioned Bid Validity
Period |
Clarification and Extension |
Subject to
Article 5/Section 1, Bidders shall submit their clarification request no
later than 7 calendar days before Closing Date, unless otherwise requested by
Company. Subject to
Article 12 / Section 1, extension request from bidders shall be made no later
than 3 working days before Closing date,unless
otherwise requested by Company. |
Joint Bidding |
Joint bidding is accepted by the COMPANY. |
End