EBS for Better Baghdad.

Provision of supply computer and accessories Tender No.

FORM OF BID for supply computer and accessories
 
1. FORM OF BID
 
desktop   20 set Lenovo V520 cpu i5 ,Ram 8G,hard desk 1 TB  ,mouse and keyboard, with mouse pad and hdmi cable,win10 system
 
24 inch screen 40 set dell 24 inch
 
dell workstation
Precision 7730 3 set Precision 17 Inch 7730 Powerful Mobile Workstation Laptop ,
Intel Core i7-8750H, Six Core 2.20GHz, 4.10GHz Turbo, 9MB 45W,
 Windows 10 Pro 64-bit English,
 Nvidia Quadro P4200 w/8GB GDDR5,
 17.3" UltraSharp FHD IPS 1920x1080 AG, NT, Mic only, w/Prem Panel Guar 72% color gamut,
64GB, 2x32GB, DDR4-2666MHz SDRAM, 2 DIMMS, Non-ECC,
 M.2 512GB NVMe PCIe Class 50 SSD,
 Additional 2.5" 2TB 5400RPM SATA Hard Drive,
Qualcomm QCA61x4A 802.11ac Dual Band, 2x2, Wireless Adapter + Bluetooth 4.1,
 
dell workstation
Precision 7530 1 set Dell Precision 7530 Intel Core i7-8750H, Six Core 2.20GHz, 4.10GHz Turbo, 9MB 45W,Intel HD GFX,64GB, 4x16GB, DDR4-2666MHz SDRAM, 4 DIMMS, Non-ECC, M.2 1TB NVMe PCIe Class 40 SSD ,Intel Dual Band Wireless AC 9260 802.11ac MU-MIMO 2x2 + Bluetooth 5.0 vPro,15.6" FHD IPS 1920x1080 AG non-touch, Cam/Mic, 45% color gamut.
 
type-c adapter 60 set Cablor USB-C to HDMI/Ethernet / USB 3.0/ Type C/F Charging Port Adapter with 4K UHD Resolution Gigabit Ethernet
hard disk 50 set seagate 1 TB
USB flash disk 60 set 32 GB usb3.0
mini printer with cartridge 1 set HP laserjet proM12a printer with 3 original cartridge
printer 10 set hp m281
cartridge 40 set cartridge for hp m281,original
cartridge 20 set cartridge for canon mf635cx,original
The contractor has the responsibility to harmonize the local relations to make sure the smooth of the works. Otherwise company have right to terminate the contract. Total
 
 
 
 
 
2. PRICE TERMS
? Prices should ONLY be stated in USD.
? Price shall include transportation, installation, commissioning. And quality warranty for one year. 
? Final price shall be calculated by unit price and actual workload accepted by company. 
? Price shall include Tax base on Iraqi law. According to the law No. (19) 2010, No.(5) 2011and its instructions, all tax amounts including withholding tax above mentioned will be transferred to General Committee of Taxation(GCT) of Iraq 
3. PAYMENT
All payment will be paid within 60 days to the available bank account outside Iraq; otherwise the payment will be delay at least for six months. 
4. Technical Requirement
Please refer to attached Scope of Work.
5. DOCUMENT REQUIREMENT
A: Commercial offer base on the price list above. 
All these information shall be put in the sealed envelope separately by Technical and Commercial. And deliver to EBS Naharawan S2-1 Camp on 27th Nov2018 
Contact person Mr. Wu Chenshen 0781 711 9604
 

2018/11/22